MALIANG WIND FARM 2nd stage were approved by Hubei Province Development and Reform Commission., located in SHAYANG TOWN, JINGMEN CITY, HUBEI PROVINCE, with aiming capacity 100000 KW, 2.5KW turbines.
ANYANG lONGTENG HEAT TREATMENT MATERIAL CO.,LTD provides M48 grade 8.8 anchor bolt cages for MALIANG WIND FARM 1ST and 2ND stage. 1st stage contract is 20 sets of foundation anchor cages while the 2nd stage is 25 sets. ANYANG LONGTENG provides high strength high performance bolt systems to the customer.
Post time: Jul-06-2020