In the past few days, our city has encountered continuous heavy rainfall and serious water accumulation inside and outside the factory. The company’s flood control emergency headquarters immediately activated the flood control emergency plan, and each emergency team member was on duty 24 hours a day, standing by at any time.
Rain is the horn, and flood is the command. The company has urgently linked up and deployed comprehensively. The production workshop, the safety and environmental department, the marketing department, the material department, the logistics department and other departments performed their duties, cooperated with each other, actively coordinated, and united to form a city, and launched a fierce competition with the rainstorm.
Emergency rescuers carried out multiple inspections of workshops, fences, and drainage pipelines in the rain throughout the night, and organized dredging and drainage. It has organized many people to fill and carry more than 1,000 sandbags in the rain, and waterproof and strengthen key parts of the flood prevention such as the downslope of the highway and the entrance of each workshop. Forklifts were used to block the underpasses to prevent the flood from flowing back, and go all out to ensure the safety of the lives and property of employees.
During the critical period of “seven lower and eight upper” flood control, Anyang Longteng will always be ready to fight against the “flood” and resolutely win the battle against flood control.
Post time: Jul-26-2021